logo
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. 86-138-13883-197 andy@tkmachinery.com
Bailey Bridge Construction Platform Temporary Steel Bridge

Bailey Bridge Construction Platform Temporary Steel Bridge

  • Highlight

    Temporary Steel Bailey Bridge

    ,

    Construction Platform Temporary Steel bridge

    ,

    Construction Platform Bailey Bridge

  • Material
    S460J0,S355JR,S235JR
  • Single Span
    9~36m
  • Net Width
    4m~20m
  • Load
    50T ~250T
  • Color
    Green, Grey, Orange,Red
  • Application
    Construction
  • Place of Origin
    China
  • Brand Name
    Tongkai
  • Certification
    ISO9001, EN1090,ISO3834
  • Model Number
    TK100
  • Document
  • Minimum Order Quantity
    1set
  • Price
    FOB1000USD
  • Packaging Details
    Nude Packing ,Steel case
  • Delivery Time
    15days
  • Payment Terms
    L/C, T/T, Western Union, MoneyGram
  • Supply Ability
    500T/M

Bailey Bridge Construction Platform Temporary Steel Bridge

Bailey Bridge Deck Type Bridge Compact 100 Large wide Construction Platform Temporary

 

Brief Introduction

 

Deck-type panel bridges are normally two lanes, class 50 or higher bridges assembled to replace single-lane bridges. A deck-type panel bridge has the following advantages over a through-type bridge :

  •   Roadway can be wider for passage of extra-wide vehicles.
  •   Deck-type assembly allows greater side overhang of vehicles.
  •   A lighter decking system can be used when the roadway is supported by trusses.
  •   With some sloping banks, the span between abutments is shorter than in a through-type bridge, because bearings are set 5 feet (1.5 meters)   below road level.
  •  Demolished piers need not be built Up to the level of the roadway.
  •  There are no overhead restrictions.

 

A deck-type panel bridge has the following disadvantages:

  • Excavation at abutments may be necessary because bearings are 5 feet (1.5 meters) below the roadway.
  • It is more difficult to launch.
  • It must be lowered 5 feet (1.5 meters) onto the bearings.
  • Waterway clearance is decreased.

 

APPLICATION

  • Temporary bridging
  • Rural infrastructure project 
  • Construction Platform 
  • Heavy load 
  • Wide Width required 

Bailey Bridge Construction Platform Temporary Steel Bridge 0