logo
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. 86-138-13883-197 andy@tkmachinery.com
Suspension Bailey Bridge Compact 200 Extra Wide 4.2m Heavy Load Bailey Bridge Large Span

Suspension Bailey Bridge Compact 200 Extra Wide 4.2m Heavy Load Bailey Bridge Large Span

  • Highlight

    Large Span Suspension Bailey Bridge

    ,

    Compact 200 Suspension Bailey Bridge

    ,

    Heavy Load Bailey Bridge Large Span

  • Name
    Bailey Suspension Bridge
  • Span
    60~150m
  • Lane
    Single Lane 3.15m~4.2m,Double Lane 7.35m
  • Material
    S460J0,S355JR,S355J0,Gr65,Gr50
  • Load
    HA ,HB,HA+20HB,AASHTO HL-93,HS35-44
  • Surface Finish
    Pained Or Galvanized
  • Place of Origin
    China
  • Brand Name
    Tongkai
  • Certification
    ISO,EN1090,SGS ,CIDB
  • Model Number
    ZB200
  • Document
  • Minimum Order Quantity
    1 set
  • Price
    1000USD ~1800USD/ton
  • Packaging Details
    Nude and Steel case
  • Delivery Time
    15~45days
  • Payment Terms
    L/C, T/T, Western Union, MoneyGram
  • Supply Ability
    3000/month

Suspension Bailey Bridge Compact 200 Extra Wide 4.2m Heavy Load Bailey Bridge Large Span

PRODUCT DESCRIPTION

 

General Description:

It is a type of bridge which can be used as a permanent or semi-permanent bridge over wide rivers, bays, canyons and mountainous areas, it can also be used as temporary construction bridge.

 

Introduction

Bailey Bridge is a standard bridge equipment, adopted extensively and the most popular in the world

 

Advantage

Possessing the features of simple structure.

convenient transport, speedy erection

easy disassembling.

heavy loading capacity,

great stability and long fatigue life

being capable of an alternative span, loading capacity

 

Features

1. High strength and big stiffness , relative to the concrete bridge can be reduced trabecular high and self-respect

2. Due to the steel isotropic, quality of a material is uniform and modulus of elasticity, that make steel bridge in the working condition and calculation compared with the assumption

3. Steel bridge generally USES factory, site splicing, the construction period is short, processing convenient and not affected bv seasonal effect.

4. Steel bridge is suitable for industrialized manufacture and very convenient to transport.

5. Steel bridge is easy to repair and replace, long lifetime, material can be recycled.

 

Suspension Bailey Bridge Compact 200 Extra Wide 4.2m Heavy Load Bailey Bridge Large Span 0