logo
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. 86-138-13883-197 andy@tkmachinery.com
Steel Truss Bridge Steel bridge Large span Heavy Load  For Construction Site Access And Replacement In High Demand

Steel Truss Bridge Steel bridge Large span Heavy Load For Construction Site Access And Replacement In High Demand

  • Highlight

    Q345 Steel Truss Bridge

    ,

    Q355B Steel Truss Bridge

    ,

    Q235 truss steel bridge

  • Material
    S460J0,S355JR,S355J0,Gr65,Gr50
  • Load
    HA ,HB,HA+20HB,AASHTO HL-93,HS35-44
  • Lane
    Single Lane4.2m,Double Lane 7.35m, Three Lane:10.5m
  • Surface Finish
    Painted Or Galvanized
  • Aesthetics
    Modern
  • Tracked Load
    50~80Ts
  • Load Capacity
    High
  • Application
    Steel Structure Bridge
  • Life
    100 Years
  • Bridge Deck
    Steel ,Concrete
  • Max Span
    90 Meters
  • Loading
    HS15,HS20-44,HS25-44, HA,HA+HB ....
  • Usage
    Bridge
  • Support
    Abutment , Piers
  • Size
    Customized Size
  • Panel Size
    9000mm*11000mm
  • Surface Protection
    Hot-dip Galvanized
  • Place of Origin
    China
  • Brand Name
    Tongkai
  • Certification
    ISO,EN1090,SGS ,
  • Model Number
    Truss bridge
  • Document
  • Minimum Order Quantity
    1 set
  • Price
    1500USD ~2000USD/ton
  • Packaging Details
    Nude and Steel case
  • Delivery Time
    45days
  • Payment Terms
    L/C, T/T, Western Union, MoneyGram
  • Supply Ability
    3000/month

Steel Truss Bridge Steel bridge Large span Heavy Load For Construction Site Access And Replacement In High Demand

Steel Truss Bridge Steel bridge Large span Heavy Load  For Construction Site Access And Replacement In High Demand 0

Typical Spans:

● From 30 meters to 110 meters

 

Typical Characteristics:

● Warren through truss

● 5-meters bays ensure modularity between spans

● Class A width: 1m sidewalk + 7m roadway + 1m sidewalk

● Class B width: 0.5m sidewalk + 6m roadway + 0.5m sidewalk

● Utilizes steel deck as permanent formwork

● Double pipe handrails

● Elastomeric bearings with steel plate reinforcement

● Deck protection angle

● High tension Bolts

● Full hot dip galvanizing to all elements

 

Standard Supplied Erection Aids:

● Bolts spares

● Drift pins for precise bolt hole alignment

● Temporary Deck Bracing Angles

 

Typical Supply Time:

● 3 months

 

Application:

● Long -Span

● Permanent or semi-permanent bridging

● Heavy Load

● Highway bridge

● Rural infrastructure project

● Construction,forestry,oil and mining activities

● Construction site access

● Replacement of damaged bridge

Steel Truss Bridge Steel bridge Large span Heavy Load  For Construction Site Access And Replacement In High Demand 1 Steel Truss Bridge Steel bridge Large span Heavy Load  For Construction Site Access And Replacement In High Demand 2